#EvolutionX #ROM #Unofficial #Peridot #V
Evolution X 10.7 - UNOFFICIAL | Android 15
Updated: 21/06/2025
▪️Download
▪️Installation
▪️Support
▪️Screenshots
Changelog:
• Fixed USSD dual sim.
• Fixed Top speaker in lockscreen (using sensor overlay)
• Disable sdrHdrRatio.
• Enable HBM via disp_feature on udfps.
• Enable screen off fingerprint.
• Switch back to stock MiuiCamera.
• Optimize cpu for performance.
Known Bugs:
• Audio for fs19xx driver
• More add FP will broken biometrics in strong app
Notes:
• June, 2025 Security patch
• Use one FP for strong biometrics in app
• Use EvoX recovery for sideload
Credits:
• Adarsh Grewal and Raghav for their Work.
• Peridot Team.
• Thanks to all tester.
By @ramshell688
Follow @PocoF6UpdateID
Join @PocoF6Indo
>>Click here to continue<<
